Metal3DPrinting.ai

Engineering evidence. Investment clarity.

Get Started

Machine evidence

EOS M 400-4: specs & public price evidence

Decision context / editorial guidance

Screen the application.
Then qualify the process.

Worth investigating if: your supplier can demonstrate the required alloy, geometry and finished-part specification on the quoted EOS M 400-4 configuration.

Do not buy on this page alone: a published envelope or machine configuration does not establish repeatability, accepted-part cost or local support.

Editorial purchasing guidance, not a verified recommendation for a particular application.

Published geometry / not guaranteed part fit

X 400 · Y 400 · Z 400 mm

Front view shows X:Z proportions. Depth Y is stated numerically. Supports and clearance reduce usable space.

Compare this machine →

Availability unconfirmed

At a glance

What is it?

EOS M 400-4 is a larger LPBF system with a published 400 × 400 × 400 mm build space and four 400 W lasers.

How does it print?

Laser powder bed fusion (LPBF): a laser melts thin layers of metal powder to build a part.

When might I consider it?

Consider it when you need the larger published build space or want to evaluate a four-laser LPBF configuration.

Build space400 x 400 x 400 mm (incl. build platform)This is the published build space for the stated configuration. Supports and process requirements can reduce usable space.
Laser configuration4 × 400 WThis describes the machine configuration. Configuration alone does not establish build speed or finished-part output.
MaterialsSee supported material evidenceConfirm the exact alloy, settings and qualified process with the supplier.
Public price$2,364,744 (lot) · FEDERAL · 2023Use a current configured supplier quote in any economic comparison.

What public specs cannot tell you: finished-part speed, cost, quality or fit for your exact application.

Powder bed fusion · laser powder bed fusion (LPBF) · EOS

Use in calculator →Compare machines
Availability and review notes
Availability not independently confirmed; request a current OEM quote.

Source review: . Source-specific review dates appear beside each fact.

Published capabilities

CapabilitySource-backed detail
EOS M 400-4 build volume400 x 400 x 400 mm (incl. build platform)OEM ↗ · OEM source checked
EOS M 400-4 lasersYb-fiber; 4 x 400 W; four 250 x 250 mm areas with 50 mm overlapOEM ↗ · OEM source checked
More published specifications and source notes
Published detailEvidence
EOS M 400-4 powermax 45.0 kW / typical 22.0 kW; supply 3 x 50 AOEM ↗ · OEM source checked
EOS M 400-4 footprint/weight5140 x 2490 x 2625 mm; approx 4900 kgOEM ↗ · OEM source checked
Materials — OEM scopeOEM-listed examples: AlSi10Mg, IN718, IN625, 316L, Ti64 and MS1. Exact alloy and process qualification still require confirmation.OEM ↗ · OEM source checked
Layer thicknessMaterial-specific examples: AlSi10Mg 40/80 µm; IN625 80 µm; Ti64 60 µm. These are published parameter choices, not a universal machine range.OEM ↗ · OEM source checked
Machine weightApproximately 4900 kg.OEM ↗ · OEM source checked
Manufacturer positioningEOS presents the M 400-4 as a quad-laser production system.OEM ↗ · OEM source checked
Gas / atmosphere — stated scopeInert gas supply: 7,000 hPa; 15 m³/h (102 psi; 706 ft³/h).OEM ↗ · OEM source checked
Published print speed / throughput — stated basisOEM data-sheet build-rate table, material-specific: up to 172.8 cm³/h (EOS Titanium Ti64 Grade 5 / Grade 23); 172.8 cm³/h (EOS Titanium TiCP); 120.96 cm³/h (EOS StainlessSteel 316L); 106.8 cm³/h (EOS MaragingSteel MS1); 100.8 cm³/h (EOS Aluminium AlSi10Mg); 74.9 cm³/h (EOS NickelAlloy IN939); 60.4 cm³/h (EOS NickelAlloy IN718; EOS NickelAlloy HX); 55.3 cm³/h (EOS CaseHardeningSteel 20MnCr5).OEM ↗ · OEM source checked

Public price evidence

FEDERAL · 2023 $2,364,744 (lot)

Single federal lot including accessories, installation, training and consumables — a turnkey bundle, not a base-system price. A separate 2025 record is a 52-week federal lease of $985,664.06: a lease payment total, not a purchase price, labeled separately in the lease and rental evidence block on the machine page.

Lease and rental evidence

These rows are lease or rental payments — operating costs. They are not purchase prices, and they never appear in the at-a-glance price or any purchase-price field on this page.
AmountDateRecordEvidence type and channelScope caveat
$985,664.06W519TC25PA096 ↗
52 WEEK LEASE OF AN EOS M400-4 3D PRINTER, SEE M400 LEASE PURCHASE DESCRIPTION
FEDERAL LEASE · 2025
Reseller (Phillips Corporation)
52-week lease, lease-to-own structure per the FPDS description — a lease payment total, not a purchase price

Our reproduced records ↗

Public price evidence is a dated public record — a federal award, a launch announcement or a labeled estimate — not a current retail quote. Use a configured supplier quote for any purchase decision.

More public price data and record types · Ready to talk to a supplier about this machine? Send a structured RFQ — free, no account required.

Head-to-head evidence from the same record set: Compare against Nikon SLM 500 · Compare against EOS M 290 · Compare against Colibrium M Line · Compare against DMP Factory 500 · Compare against Renishaw RenAM 500 · Compare against TRUMPF TruPrint 5000 (legacy) · Compare against Velo3D Sapphire XC.

What still needs a supplier answer

Purchasing questionEvidence gap
All-in delivered machine priceCurrent quote required
Build time for your partNot verified for your geometry
Alloy and parametersConfirm the exact qualified combination
Application fitConfirm tolerances, finishing, inspection and local support

Source review dates identify when the cited material was reviewed. A source review is not a performance test; genuine third-party corroboration is identified separately. The M 400-4 OEM technical table was checked against the cited manufacturer source.

Prepare a useful quote request

Send your exact alloy, dimensions, orientation, supports, inspection criteria and finishing route. Ask for usable build space and effective build time for that configuration. Include installation, training, service, software, gas supply and qualification in the delivered quote. Unverified fields on this page can be used as questions to confirm directly with the manufacturer before purchase.

Check material evidence →Considering this machine? Check comparable alternatives →Contribute a machine quote →Ask a question or suggest a correction →